Note 16: Commitments and Contingencies
Commitments have been made in connection with certain construction programs. The estimated capital expenditures required under legal and binding contractual obligations amounted to $1.5 billion as of December 31, 2025.
The Company’s regulated subsidiaries maintain agreements with other water purveyors for the purchase of water to supplement their water supply. The Company purchased $138 million, $129 million and $125 million of water under these agreements during 2025, 2024 and 2023, respectively. Presented in the table below are the future annual commitments related to minimum quantities of purchased water having non-cancelable contracts:
Amount
2026$83 
202777 
202878 
202979 
203055 
Thereafter968 
The Company enters into agreements for the provision of services to water and wastewater facilities for the U.S. military, municipalities and other customers. See Note 4—Revenue Recognition for additional information regarding the Company’s performance obligations.
Contingencies
The Company is routinely involved in legal actions incident to the normal conduct of its business. As of December 31, 2025, the Company has accrued approximately $8 million of probable loss contingencies and has estimated that the maximum amount of loss associated with reasonably possible loss contingencies arising out of such legal actions, which can be reasonably estimated, is $4 million. For certain legal actions, the Company is unable to estimate possible losses. The Company believes that damages or settlements, if any, recovered by plaintiffs in such legal actions, other than as described in this Note 16—Commitments and Contingencies, will not have a material adverse effect on the Company.
Dunbar, West Virginia Class Action Litigation Settlement
On the evening of June 23, 2015, a 36-inch pre-stressed concrete transmission water main, installed in the early 1970s, failed. The water main is part of the West Relay pumping station located in the City of Dunbar, West Virginia and owned by the Company’s West Virginia subsidiary (“WVAWC”). Water service was fully restored by July 1, 2015, to all customers affected by this event.
On June 2, 2017, a complaint captioned Jeffries, et al. v. West Virginia-American Water Company was filed in West Virginia Circuit Court in Kanawha County on behalf of an alleged class of residents and business owners who lost water service or pressure as a result of the Dunbar main break. The complaint alleged breach of contract by WVAWC for failure to supply water, violation of West Virginia law regarding the sufficiency of WVAWC’s facilities and negligence by WVAWC in the design, maintenance and operation of the water system. In July 2020, the Circuit Court entered an order granting the Jeffries plaintiffs’ motion for certification of a class regarding certain liability issues but denying certification of a class to determine a punitive damages multiplier.
Trial in this matter had been scheduled, but before trial commenced, the parties notified the Circuit Court that an agreement in principle to settle this litigation was reached among the parties. On May 2, 2025, the parties jointly filed with the Circuit Court a proposed class action settlement agreement (the “Dunbar Settlement”) with respect to the certified liability claims. On September 12, 2025, the Circuit Court issued an order granting final approval of the Dunbar Settlement. Under the terms of the approved Dunbar Settlement, WVAWC has not admitted, and will not admit, any fault or liability for any of the allegations made by the Jeffries plaintiffs. The maximum pre-tax amount of the Dunbar Settlement is approximately $18 million, of which the final amount of the Company’s and WVAWC’s contributions to the Dunbar Settlement is approximately $5 million (which have been funded through existing sources of liquidity), and the remainder has been contributed by certain of the Company’s general liability insurance carriers. The Company previously recorded in the fourth quarter of 2024 a charge to earnings, net of expected insurance receivables, of $5 million ($4 million after-tax), with respect to the Dunbar Settlement. The actual total amount to be paid to claimants through the Dunbar Settlement will depend upon the claims approved through the claims process, but the Company does not currently anticipate that its maximum liability will materially exceed $5 million. The deadline for claims submissions was August 25, 2025, and the settlement administrator is evaluating claim submissions to identify compensable claims.
Chattanooga, Tennessee Class Action Litigation
On September 12, 2019, the Company’s Tennessee subsidiary (“TAWC”), experienced a leak in a 36-inch water transmission main, which caused service fluctuations or interruptions to TAWC customers and the issuance of a boil water notice. TAWC repaired the main by early morning on September 14, 2019, and restored full water service by the afternoon of September 15, 2019, with the boil water notice lifted for all customers on September 16, 2019.
On September 17, 2019, a complaint captioned Bruce, et al. v. American Water Works Company, Inc., et al. was filed in the Circuit Court of Hamilton County, Tennessee against TAWC, the Company and American Water Works Service Company, Inc. (“Service Company” and, together with TAWC and the Company, collectively, the “Tennessee-American Water Defendants”), on behalf of a proposed class of individuals or entities who lost water service or suffered monetary losses as a result of the Chattanooga incident (the “Tennessee Plaintiffs”). The complaint alleged breach of contract and negligence against the Tennessee-American Water Defendants, as well as an equitable remedy of piercing the corporate veil. In the complaint as originally filed, the Tennessee Plaintiffs were seeking an award of unspecified alleged damages for wage losses, business and economic losses, out-of-pocket expenses, loss of use and enjoyment of property and annoyance and inconvenience, as well as punitive damages, attorneys’ fees and pre- and post-judgment interest. In September 2020, the court dismissed all of the Tennessee Plaintiffs’ claims in their complaint, except for the breach of contract claims against TAWC.
In January 2023, after hearing oral argument, the court issued an oral ruling denying the Tennessee Plaintiffs’ motion for class certification. In February 2023, the Tennessee Plaintiffs sought reconsideration of the ruling by the court, and any final ruling is appealable to the Tennessee Court of Appeals, as allowed under Tennessee law. In September 2023, the court upheld its prior ruling but gave the Tennessee Plaintiffs the option to file an amended class definition. In October 2023, the Tennessee Plaintiffs filed an amended class definition seeking certification of a business customer-only class. On June 14, 2024, the court issued its written order denying the Tennessee Plaintiffs’ amended class and incorporating its denial of certification of the original residential class. On June 21, 2024, the Tennessee Plaintiffs appealed both of the court’s orders denying class certification. On December 4, 2025, the Court of Appeals of Tennessee denied the Tennessee Plaintiffs’ appeal, and on January 30, 2026, the Tennessee Plaintiffs filed an appeal with the Supreme Court of Tennessee. This matter remains pending.
The Company and TAWC believe that TAWC has valid, meritorious defenses to the claims raised in this class action complaint. TAWC will continue to vigorously defend itself against these allegations. Given the current stage of this proceeding, the Company cannot currently determine the likelihood of a loss, if any, or estimate the amount of any loss or a range of loss related to this proceeding.
Mountaineer Gas Company Main Break
During the afternoon of November 10, 2023, WVAWC was informed that an 8-inch ductile iron water main owned by WVAWC, located on the West Side of Charleston, West Virginia and originally installed in approximately 1989, experienced a leak. In the early morning hours of November 11, 2023, WVAWC crews successfully completed a repair to the water main. A precautionary boil water advisory was issued the same day to approximately 300 WVAWC customers and ultimately lifted on November 12, 2023.
On November 10, 2023, a break was reported in a low-pressure natural gas main located near the affected WVAWC water main, and an inflow of water into the natural gas main and associated delivery pipelines occurred. The natural gas main and pipelines are owned by Mountaineer Gas Company, a regulated natural gas distribution company serving over 220,000 customers in West Virginia (“Mountaineer Gas”). The resulting inflow of water into the natural gas main and related pipelines resulted in a loss of natural gas service to approximately 1,500 Mountaineer Gas customers, as well as water entering customer service lines and certain natural gas appliances owned or used by some of the affected Mountaineer Gas customers. Mountaineer Gas reported that restoration of natural gas service to all affected gas mains occurred on November 24, 2023. The timing, order and causation of both the WVAWC water main break and Mountaineer Gas’s main break are currently unknown and under investigation.
To date, a total of four pending lawsuits have been filed against Mountaineer Gas and WVAWC purportedly on behalf of customers in Charleston, West Virginia related to these incidents. On November 14, 2023, a complaint captioned Ruffin et al. v. Mountaineer Gas Company and West Virginia-American Water Company was filed in West Virginia Circuit Court in Kanawha County on behalf of an alleged class of Mountaineer Gas residential and business customers and other households and businesses supplied with natural gas in Kanawha County, which lost natural gas service on November 10, 2023, as a result of these events. The complaint alleges, among other things, breach of contract by Mountaineer Gas, trespass by WVAWC, nuisance by WVAWC, violation of statutory obligations by Mountaineer Gas and WVAWC, and negligence by Mountaineer Gas and WVAWC. The complaint seeks class-wide damages against Mountaineer Gas and WVAWC for loss of use of natural gas, annoyance, inconvenience and lost profits, as well as punitive damages.
On November 15, 2023, a complaint captioned Toliver et al. v. West Virginia-American Water Company and Mountaineer Gas Company was filed in West Virginia Circuit Court in Kanawha County on behalf of an alleged class of all natural persons or entities who are citizens of the State of West Virginia and who are customers of WVAWC and/or Mountaineer Gas in the affected areas. The complaint alleges against Mountaineer Gas and WVAWC, among other things, negligence, nuisance, trespass and strict liability, as well as breach of contract against Mountaineer Gas. The complaint seeks class-wide damages against Mountaineer Gas and WVAWC for property damage, loss of use and enjoyment of property, annoyance and inconvenience and business losses, as well as punitive damages.
On November 16, 2023, a complaint captioned Dodson et al. v. West Virginia American Water and Mountaineer Gas Company was filed in West Virginia Circuit Court in Kanawha County on behalf of an alleged class of all West Virginia citizens living between Pennsylvania Avenue south of Washington Street, and Iowa Street, who are customers of Mountaineer Gas. The complaint alleges against Mountaineer Gas and WVAWC, among other things, negligence, nuisance, trespass, statutory code violations and unfair or deceptive business practices. The complaint seeks class-wide damages against Mountaineer Gas and WVAWC for property loss and damage, loss of use and enjoyment of property, mental and emotional distress, and aggravation and inconvenience, as well as punitive damages.
On January 4, 2024, a fourth complaint, captioned Thomas v. West Virginia-American Water Company and Mountaineer Gas Company, was filed in West Virginia Circuit Court in Kanawha County asserting similar allegations as those included in the Ruffin, Toliver and Dodson lawsuits, with the addition of counts alleging unjust enrichment and violations of the West Virginia Human Rights Act and the West Virginia Consumer Credit and Protection Act.
On November 17, 2023, the Ruffin plaintiff filed a motion to consolidate the class action lawsuits before a single judge in Kanawha County Circuit Court. On June 14, 2024, the judge in the Ruffin case partially granted the motion by transferring all of the four class action lawsuits to her court but deferring as premature consolidation of the cases.
On December 5, 2023, a complaint captioned Mountaineer Gas Company v. West Virginia-American Water Company was filed in West Virginia Circuit Court in Kanawha County seeking damages under theories of trespass, negligence and implied indemnity. The damages being sought related to the incident include, among other things, repair and response costs incurred by Mountaineer Gas and attorneys’ fees and expenses incurred by Mountaineer Gas. On March 6, 2024, the motion to transfer this complaint to the West Virginia Business Court was granted and trial and resolution judges were assigned. The Business Court has set a trial date of August 10, 2026, for this matter.
On December 20, 2023, Mountaineer Gas filed answers to each of the first three class action lawsuits, which included cross-claims against WVAWC alleging that Mountaineer Gas is without fault for the claims and damages alleged in the lawsuits and WVAWC should be required to indemnify Mountaineer Gas for any damages and for attorneys’ fees and expenses incurred by Mountaineer Gas in the lawsuits. WVAWC has filed a partial motion to dismiss certain claims in the Ruffin, Toliver, Dodson and Thomas lawsuits and a motion to dismiss the cross-claims asserted against WVAWC therein by Mountaineer Gas. Mountaineer Gas subsequently voluntarily dismissed its cross-claims. On December 22, 2025, the Kanawha County Circuit Court entered a joint order setting a schedule for class certification with a hearing on the motion to be held on March 17, 2026. The Court also ordered mediation and continued the previously set February 2, 2026 trial date.
On December 6, 2023, WVAWC initiated a process whereby Mountaineer Gas customers could file claims with WVAWC and seek payment from WVAWC of up to $2,000 in damages per affected household for the inconvenience arising from a loss of use of their appliances and documented out-of-pocket expenses as a result of the natural gas outage. In light of the diminishing number of new claims that had been filed, the claims process was concluded on March 8, 2024. As of December 31, 2024, a total of 594 Mountaineer Gas customers completed this claims process, and each of those customers has been paid by WVAWC an average of approximately $1,500. In return, these customers were required to execute a partial release of liability in favor of WVAWC.
On November 16, 2023, the Public Service Commission of West Virginia (the “WVPSC”) issued an order initiating a general investigation into both the water main break and natural gas outages occurring in this incident to determine the cause or causes thereof, as well as breaks and outages generally throughout the systems of WVAWC and Mountaineer Gas and the utility practices of both utilities. Following a series of disagreements among the parties regarding the scope of discovery, the WVPSC closed the general investigation into both utilities and ordered a separate general investigation for each utility. The WVPSC focused the two general investigations away from the cause of the events and instead on the maintenance practices of each utility during and after the main breaks. On January 29, 2024, the Consumer Advocate Division of the WVPSC filed a motion to intervene in the WVAWC general investigation.
On April 24, 2024, the staff issued a final joint memorandum in the Mountaineer Gas general investigation stating its view that Mountaineer Gas responded appropriately, reasonably and according to Mountaineer Gas’s written procedures. The staff is making no recommendations for improvements to Mountaineer Gas and is recommending that the Mountaineer Gas general investigation be closed. On July 24, 2024, the staff issued a final joint memorandum in the WVAWC general investigation finding no indication of systematic failure by WVAWC and concluding WVAWC’s maintenance and operating procedures were adequate to ensure safe and reliable service, subject to the implementation by WVAWC of three recommended operational improvements. Both general investigations remain pending.
The Company and WVAWC believe that the causes of action and other claims asserted against WVAWC in the class action complaints and the lawsuit filed by Mountaineer Gas are without merit and that WVAWC has valid, meritorious defenses to such claims. WVAWC continues to defend itself vigorously in these litigation proceedings.
Given the current stage of these proceedings and the general investigation, the Company and WVAWC are currently unable to predict the outcome of any of the proceedings described above, and the Company cannot currently determine the likelihood of a loss, if any, or estimate the amount of any loss or a range of loss related to this proceeding.
Alternative Water Supply in Lieu of Carmel River Diversions
Compliance with Orders to Reduce Carmel River Diversions—Monterey Peninsula Water Supply Project
Under a 2009 order (the “2009 Order”) of the State Water Resources Control Board (the “SWRCB”), the Company’s California subsidiary (“Cal Am”) is required to decrease significantly its yearly diversions of water from the Carmel River according to a set reduction schedule. In 2016, the SWRCB issued an order (the “2016 Order,” and, together with the 2009 Order, the “Orders”) approving a deadline of December 31, 2021, for Cal Am’s compliance with these prior orders.
Cal Am is currently involved in developing the Monterey Peninsula Water Supply Project (the “Water Supply Project”), which includes the construction of a desalination plant, to be owned by Cal Am, and the construction of wells that would supply water to the desalination plant. In addition, the Water Supply Project also includes Cal Am’s purchase of water from a groundwater replenishment project (the “GWR Project”) between Monterey One Water and the Monterey Peninsula Water Management District (the “MPWMD”), as well as an expanded aquifer storage and recovery program. The Water Supply Project is intended, among other things, to fulfill Cal Am’s obligations under the Orders.
Cal Am’s ability to move forward on the Water Supply Project is and has been subject to administrative review by the CPUC and other government agencies, obtaining necessary permits, and intervention from other parties. In 2016, the CPUC unanimously approved a final decision to authorize Cal Am to enter into a water purchase agreement for the GWR Project and to construct a pipeline and pump station facilities and recover up to $50 million in associated incurred costs, plus AFUDC, subject to meeting certain criteria.
In 2018, the CPUC unanimously approved another final decision finding that the Water Supply Project meets the CPUC’s requirements for a certificate of public convenience and necessity and an additional procedural phase was not necessary to consider alternative projects. The CPUC’s 2018 decision concludes that the Water Supply Project is the best project to address estimated future water demands in Monterey, and, in addition to the cost recovery approved in its 2016 decision, adopts Cal Am’s cost estimates for the Water Supply Project, which amounted to an aggregate of $279 million plus AFUDC at a rate representative of Cal Am’s actual financing costs. The 2018 final decision specifies the procedures for recovery of all of Cal Am’s prudently incurred costs associated with the Water Supply Project upon its completion, subject to the frameworks included in the final decision related to cost caps, operation and maintenance costs, financing, ratemaking and contingency matters. The reasonableness of the Water Supply Project costs will be reviewed by the CPUC when Cal Am seeks cost recovery for the Water Supply Project. Cal Am is also required to implement mitigation measures to avoid, minimize or offset significant environmental impacts from the construction and operation of the Water Supply Project and comply with a mitigation monitoring and reporting program, a reimbursement agreement for CPUC costs associated with that program, and reporting requirements on plant operations following placement of the Water Supply Project in service. Cal Am has incurred $324 million in aggregate costs as of December 31, 2025, related to the Water Supply Project, which includes $107 million in AFUDC.
In September 2021, Cal Am, Monterey One Water and the MPWMD reached an agreement on Cal Am’s purchase of additional water from an expansion to the GWR Project. On December 5, 2022, the CPUC issued a final decision that authorized Cal Am to enter into the amended water purchase agreement, and specifically to increase pumping capacity and reliability of groundwater extraction from the Seaside Groundwater Basin. The final decision sets the cost cap for the proposed facilities at approximately $62 million. Cal Am may seek recovery of amounts above the cost cap in a subsequent rate filing or general rate case. Additionally, the final decision authorizes AFUDC at Cal Am’s actual weighted average cost of debt for most of the facilities. On December 30, 2022, Cal Am filed with the CPUC an application for rehearing of the CPUC’s December 5, 2022, final decision, and on March 30, 2023, the CPUC issued a decision denying Cal Am’s application for rehearing, but adopting its proposed AFUDC for already incurred and future costs. The decision also provided Cal Am the opportunity to serve supplemental testimony to increase its cost cap for certain of the Water Supply Project’s extraction wells. On May 21, 2025, the CPUC issued a decision authorizing an increase to the cost cap of $11 million for the specified extraction wells.
The amended water purchase agreement and a memorandum of understanding to negotiate certain milestones related to the expansion of the GWR Project have been signed by the relevant parties. Further hearings were scheduled in a Phase 2 to this CPUC proceeding to focus on updated supply and demand estimates for the Water Supply Project, and Phase 2 testimony was completed in September 2022. On October 23, 2023, a status conference was held to determine procedural steps to conclude the proceeding. Further evidentiary hearings were held in March 2024. On May 9, 2025, the CPUC issued a proposed decision in Phase 2, finding that without the Water Supply Project, projected demand will outstrip supply by approximately 2,500 acre-feet per year for 2050. On August 14, 2025, the CPUC approved a final decision updating the supply and demand estimates for the Water Supply Project, finding that the projected demand will outstrip supply by approximately 2,600 acre-feet per year for 2050. On September 17, 2025, the City of Marina (the “City”), the Marina Coast Water District (“MCWD”) and the MPWMD filed applications for rehearing of the final decision. On September 22, 2025, these parties also filed a motion to stay the final decision. On October 9, 2025, the CPUC issued a factual correction to the final decision to find that the projected demand will outstrip supply by approximately 2,500 acre-feet per year for 2050 and did not rule on the other motions.
While Cal Am believes that its expenditures to date have been prudent and necessary to comply with the Orders, as well as relevant final decisions of the CPUC related thereto, Cal Am cannot currently predict its ability to recover all of its costs and expenses associated with the Water Supply Project and there can be no assurance that Cal Am will be able to recover all of such costs and expenses in excess of the $123 million in previously approved aggregate construction costs, plus applicable AFUDC, previously approved by the CPUC in its September 2016 decision, its December 2022 decision (as amended by its March 2023 rehearing decision), and its May 2025 decision.
Coastal Development Permit Application
In 2018, Cal Am submitted a coastal development permit application (the “Marina Application”) to the City for those project components of the Water Supply Project located within the City’s coastal zone. Members of the City’s Planning Commission, as well as City councilpersons, publicly expressed opposition to the Water Supply Project. In May 2019, the City issued a notice of final local action based upon the denial by the Planning Commission of the Marina Application. Thereafter, Cal Am appealed this decision to the Coastal Commission, as permitted under the City’s code and the California Coastal Act. At the same time, Cal Am submitted an application (the “Original Jurisdiction Application”) to the Coastal Commission for a coastal development permit for those project components located within the Coastal Commission’s original jurisdiction. After Coastal Commission staff issued reports recommending denial of the Original Jurisdiction Application, noting potential impacts on environmentally sensitive habitat areas and wetlands and possible disproportionate impacts to communities of concern, in September 2020, Cal Am withdrew the Original Jurisdiction Application in order to address the staff’s environmental justice concerns. In November 2020, Cal Am refiled the Original Jurisdiction Application.
In October 2022, Cal Am announced a phasing plan for the proposed desalination plant component of the Water Supply Project. The desalination plant and slant wells originally approved by the CPUC would produce up to 6.4 million gallons of desalinated water per day. Under the phased approach, the facilities would initially be constructed to produce up to 4.8 million gallons per day of desalinated water, enough to meet anticipated demand through about 2030, and would limit the number of slant wells initially constructed. As demand increases in the future, desalination facilities would be expanded to meet the additional demand. The phased approach seeks to meet near-term demand by allowing for additional supply as it becomes needed, while also providing an opportunity for regional future public participation and was developed by Cal Am based on feedback received from the community.
In November 2022, the Coastal Commission approved the Marina Application and the Original Jurisdiction Application with respect to the phased development of the proposed desalination plant, subject to compliance with a number of conditions, all of which Cal Am expects to satisfy. In December 2022, the City, MCWD, MCWD’s groundwater sustainability agency, and the MPWMD jointly filed a petition for writ of mandate in Monterey County Superior Court against the Coastal Commission, alleging that the Coastal Commission violated the California Coastal Act and the California Environmental Quality Act in issuing a coastal development permit to Cal Am for construction of slant wells for the Water Supply Project. Cal Am is named as a real party in interest. On April 24, 2024, the court granted defendants’ motion for judgment on the pleadings and dismissed one of MCWD’s causes of action in the petition. A trial commenced on December 9, 2024, and further proceedings continued in January 2025. On May 12, 2025, the court entered its final decision denying the petition in full. On July 24, 2025, a notice of appeal was filed in this matter.
Following the issuance of the coastal development permit, Cal Am continues to work constructively with all appropriate agencies to provide necessary information in connection with obtaining the remaining required permits for the Water Supply Project. However, there can be no assurance that the Water Supply Project in its current configuration will be completed on a timely basis, if ever. For the year ended December 31, 2025, Cal Am has complied with the diversion limitations contained in the 2016 Order. Continued compliance with the diversion limitations in 2026 and future years may be impacted by a number of factors, including without limitation potential recurrence of drought conditions in California and the exhaustion of water supply reserves, and will require successful development of alternate water supply sources sufficient to meet customer demand. The Orders remain in effect until Cal Am certifies to the SWRCB, and the SWRCB concurs, that Cal Am has obtained a permanent supply of water to substitute for past unauthorized Carmel River diversions. While the Company cannot currently predict the likelihood or result of any adverse outcome associated with these matters, further attempts to comply with the Orders may result in material additional costs and obligations to Cal Am, including fines and penalties against Cal Am in the event of noncompliance with the Orders.
Cal Am’s Action for Damages Following Termination of Regional Desalination Project (“RDP”)
In 2010, the CPUC had approved the RDP, which was a precursor to the current Water Supply Project and called for the construction of a desalination facility in the City. The RDP was to be implemented through a Water Purchase Agreement and ancillary agreements (collectively, the “Agreements”) among MCWD, Cal Am and the Monterey County Water Resources Agency (“MCWRA”). In 2011, due to a conflict of interest concerning a former member of MCWRA’s Board of Directors, MCWRA stated that the Agreements were void, and, as a result, Cal Am terminated the Agreements. In ensuing litigation filed by Cal Am in 2012 to resolve the termination of the RDP, the court in 2015 entered a final judgment agreeing with Cal Am’s position that four of the five Agreements are void, and one, the credit line agreement, is not void. As a result of this litigation, Cal Am was permitted to institute further proceedings, discussed below, to determine the amount of damages that may be awarded to Cal Am as a result of the failure of the RDP.
In 2015, Cal Am and MCWRA filed a complaint in San Francisco County Superior Court against MCWD and RMC Water and Environment, a private engineering consulting firm (“RMC”), seeking to recover compensatory, consequential and incidental damages associated with the failure of the RDP, as well as punitive and treble damages, statutory penalties and attorneys’ fees. In 2019, MCWD was granted a motion for summary judgment related to the tort claims in the complaint. A settlement as to the non-tort claims was finalized and entered into in March 2020. As part of this settlement, Cal Am’s and MCWRA’s right to appeal the dismissal of their tort claims against MCWD were expressly reserved, and, in July 2020, Cal Am filed its appeal. In December 2022, the trial court’s decision was reversed on appeal with instructions to vacate its prior orders granting MCWD’s motions for summary judgment and to enter new orders denying the motions. In February 2023, MCWD filed a petition for review of the appellate decision with the California Supreme Court, which was denied in March 2023. On June 27, 2024, MCWD filed a motion for judgment on the pleadings. Following a hearing, on December 5, 2024, the court granted MCWD’s motion without leave to amend, dismissing all of Cal Am’s remaining tort claims. Final judgment was entered on January 7, 2025. On February 27, 2025, Cal Am and MCWRA each filed a Notice of Appeal of the trial court’s decision. This matter remains pending.
Proposed Acquisition of Monterey System Assets — Potential Condemnation
Local Agency Formation Commission Litigation
The water system assets of Cal Am located in Monterey, California (the “Monterey system assets”) are the subject of a condemnation action by the MPWMD stemming from a November 2018 public ballot initiative. In 2019, the MPWMD issued a preliminary valuation and cost of service analysis report, finding in part that (i) an estimate of the Monterey system assets’ total value plus adjustments would be approximately $513 million, (ii) the cost of service modeling results indicate significant annual reductions in revenue requirements and projected monthly water bills, and (iii) the acquisition of the Monterey system assets by the MPWMD would be economically feasible. In 2020, the MPWMD certified a final environmental impact report, analyzing the environmental impacts of the MPWMD’s project to (i) acquire the Monterey system assets through the power of eminent domain, if necessary, and (ii) expand its geographic boundaries to include all parts of this system.
In February 2021, the MPWMD filed an application with the Local Agency Formation Commission of Monterey County (“LAFCO”) seeking approval to become a retail water provider and annex approximately 58 parcels of land into the MPWMD’s boundaries. In June 2021, LAFCO’s commissioners voted to require a third-party independent financial study as to the feasibility of an acquisition by the MPWMD of the Monterey system assets. In December 2021, LAFCO’s commissioners denied the MPWMD’s application to become a retail water provider, determining that the MPWMD does not have the authority to proceed with a condemnation of the Monterey system assets. In April 2022, the MPWMD filed a lawsuit against LAFCO challenging its decision to deny the MPWMD’s application seeking approval to become a retail water provider. In June 2022, the court granted, with conditions, a motion by Cal Am to intervene in the MPWMD’s lawsuit against LAFCO. In December 2022, the court sustained in part, and denied in part, demurrers that had been filed by LAFCO seeking to dismiss the MPWMD’s lawsuit.
In December 2023, the Monterey County Superior Court issued a writ of mandate directing LAFCO to vacate and set aside its original denial of the MPWMD’s application to serve as a retail water provider (in conjunction with its effort to acquire the Monterey system assets) and, if requested, to re-hear the application in compliance with all applicable law. The court held that LAFCO incorrectly applied two statutory standards and noted a lack of sufficient evidence to support certain of LAFCO’s factual findings. As a result, the LAFCO denial has been nullified and LAFCO will be required to hold another hearing on the MPWMD’s application upon request. On February 8, 2024, and February 9, 2024, respectively, Cal Am and LAFCO each filed a notice of appeal with the California Court of Appeal regarding the Monterey County Superior Court’s decision to issue the writ of mandate. The MPWMD filed a notice of cross-appeal on February 15, 2024. This matter remains pending.
MPWMD Condemnation Action
Separate from the proceedings related to the MPWMD’s application with LAFCO, by letter dated October 3, 2022, the MPWMD notified Cal Am of a decision to appraise the Monterey system assets and requested access to a number of Cal Am’s properties and documents to assist the MPWMD with such an appraisal. Cal Am responded by letter on October 24, 2022, denying the request for access, stating that the MPWMD does not have the right to appraise Cal Am’s system without LAFCO approval to become a retail water provider. In April 2023, Cal Am rejected an offer by the MPWMD to purchase the Monterey system assets for $448.8 million. Over the written and oral objections of Cal Am, at a hearing held in October 2023, the MPWMD adopted a resolution of necessity to authorize it to file an eminent domain lawsuit with respect to the Monterey system assets.
In December 2023, the MPWMD filed a lawsuit against Cal Am in Monterey County Superior Court seeking to condemn the Monterey system assets. On February 26, 2024, Cal Am filed a motion requesting the Monterey County Superior Court dismiss the MPWMD’s lawsuit. Cal Am’s motion asserted that the MPWMD lacks legal authorization from both the California legislature and LAFCO to become a retail water provider and the lawsuit improperly seeks to effect a taking of property outside the boundaries of the MPWMD’s territory. Hearings on the motion were held on May 3, 2024, and August 23, 2024. On November 14, 2024, the court issued a final ruling denying Cal Am’s motion to dismiss. Cal Am filed its answer to the complaint on December 13, 2024. On August 20, 2025, Cal Am filed a motion for summary judgment, alleging that without LAFCO approval, the MPWMD does not have legal authority to pursue eminent domain. On the same date, the MPWMD filed a motion for summary adjudication of the same issue, arguing that LAFCO approval is not required to proceed with this action. By orders dated December 29, 2025, the court denied both motions. This lawsuit remains pending.
While the Company cannot currently predict the outcome of the MPWMD’s eminent domain lawsuit, the Company believes that, given existing legal authorities and its other defenses, Cal Am should be able to defend itself successfully against this lawsuit.
PFAS Multi-District Litigation
Several of the Company’s utility subsidiaries are parties to a multi-district litigation (the “MDL”) lawsuit, which commenced on December 7, 2018, in U.S. District Court for the District of South Carolina, against manufacturers of certain PFAS for damages, contribution and reimbursement of costs incurred and continuing to be incurred to address the presence of such PFAS in public water supply systems owned and operated by these utility subsidiaries and throughout their service areas. Settlements with several defendants in the MDL proceeding have received final approval by the MDL court.
As of December 31, 2025, the Company has received settlement payments from defendants 3M Company and DuPont de Nemours, Inc. totaling $159 million, net of legal fees and administrative costs and exclusive of interest. The Company intends to seek regulatory approval from its respective PUCs to apply the net proceeds for the benefit of customers, where permissible. Regulatory approvals have been obtained with respect to seven of the Company’s utility subsidiaries that are parties to the MDL, and two regulatory applications have been denied. Most of the funds received by the Company are being held in a law firm escrow account and are awaiting distribution to the Company’s utility subsidiaries that are parties to the MDL after approval or denial is received from the applicable PUCs. As of December 31, 2025, the funds held in a law firm escrow account totaled $114 million and have been recorded on the Company’s Consolidated Balance Sheet within other current assets. A corresponding amount has been recorded as a regulatory liability. As of December 31, 2025, approximately $47 million of the escrowed funds, including escrow interest, has been transferred from the law firm escrow account for distribution to utility subsidiaries that have received approval. The Company anticipates that, during 2026, it may receive one or more additional settlement payments from the defendants in the MDL.
The Company has also become aware of a number of substantially similar personal injury short-form complaints that had been filed in the MDL naming, in addition to various other water providers and manufacturers, certain Company utility subsidiaries as defendants. The Company believes that the claims asserted are without merit and the relevant utility subsidiaries have valid, meritorious defenses to the claims. In October 2025, all MDL personal injury complaints that the Company had been made aware of were dismissed by the plaintiffs without prejudice.

Historical Timeline

Fiscal YearFiled
2025Feb 18, 2026Showing above
2024Feb 19, 2025
2023Feb 14, 2024
2022Feb 15, 2023
2021Feb 16, 2022
2020Feb 24, 2021
2019Feb 18, 2020
2018Feb 19, 2019
2017Feb 20, 2018
2016Feb 21, 2017
2015Feb 25, 2016

About Commitments Disclosures

Commitments and contingencies disclosures catalog a company's off-balance-sheet obligations and legal exposures — purchase commitments, guarantee arrangements, pending litigation, and regulatory proceedings. These items represent potential future cash outflows that may not appear as liabilities on the balance sheet until they become probable and estimable.

Key signals: litigation reserves and disclosed loss ranges quantify management's estimate of legal exposure, but unquantified "reasonably possible" losses often represent the larger risk. Watch for changes in language around pending cases — shifts from "remote" to "reasonably possible" or increases in estimated loss ranges signal deteriorating outcomes. Unconditional purchase obligations and take-or-pay contracts create fixed cost structures that reduce operational flexibility. Guarantee arrangements for subsidiaries or joint ventures can create cascading obligations. Compare the total commitment schedule against projected free cash flow to assess whether the company can meet its obligations without additional financing.