COMMITMENTS AND CONTINGENCIES
Environmental Matters
Set forth below are descriptions of contingencies related to environmental matters that may impact the Evergy Companies' operations or their financial results. Management's assessment of these contingencies, which are based on federal and state statutes and regulations, and regulatory agency and judicial interpretations and actions, has evolved over time. These laws, regulations, interpretations and actions can also change, restrict or otherwise impact the Evergy Companies' operations or financial results. The failure to comply with these laws, regulations, interpretations and actions could result in the assessment of administrative, civil and criminal penalties and the
imposition of remedial requirements. The Evergy Companies believe that all their operations are in substantial compliance with current federal, state and local environmental standards.
There are a variety of final and proposed laws and regulations that could have a material adverse effect on the Evergy Companies' operations and consolidated financial results. Due in part to the complex nature of environmental laws and regulations, the Evergy Companies are unable to assess the impact of potential changes that may develop with respect to the environmental contingencies described below.
Ozone Interstate Transport State Implementation Plans (ITSIP)
In 2015, the EPA lowered the Ozone National Ambient Air Quality Standards (NAAQS) from 75 ppb to 70 ppb. States were required to submit ITSIPs in 2018 to comply with the "Good Neighbor Provision" of the Clean Air Act (CAA) as it applies to the revised NAAQS. The EPA did not act on these ITSIP submissions by the deadline established in the CAA and entered consent decrees establishing deadlines for the EPA to take final action on various ITSIPs. In February 2022, the EPA published a proposed rule to disapprove the ITSIPs submitted by nineteen states including Missouri and Oklahoma. In April 2022, the EPA published an approval of the Kansas ITSIP in the Federal Register. The Missouri Department of Natural Resources (MDNR) submitted a supplemental ITSIP to the EPA in November 2022. In February 2023, the EPA published a final rule disapproving the ITSIPs submitted by nineteen states, including the final disapproval of the Missouri and Oklahoma ITSIPs. In April 2023, the Attorneys General of Missouri and Oklahoma filed Petitions for Review in the U.S. Court of Appeals for the Eighth Circuit (Eighth Circuit) and the U.S. Court of Appeals for the Tenth Circuit (Tenth Circuit), respectively, challenging the EPA's disapproval. In May 2023, the Eighth Circuit granted a stay of the EPA's disapproval of the Missouri ITSIP. Similarly, in July 2023, the Tenth Circuit granted a stay of the EPA's disapproval of the Oklahoma ITSIP. In August 2024, the EPA published in the Federal Register a proposed rule to disapprove the supplemental ITSIP that Missouri submitted in November 2022. In January 2024, the EPA proposed to disapprove the previously-approved ITSIP for Kansas and ITSIPs submitted by four other states. To date, the EPA has not taken final action in this rulemaking. Disapproval of ITSIPs provides the EPA with authority to implement an interstate transport federal implementation plan (ITFIP) to replace them. As discussed below, the EPA has proposed to reevaluate and approve previously disapproved ITSIP submissions for five states, including Kansas. In the event that the ITSIPs for Missouri, Oklahoma and Kansas were disapproved and the EPA's ITFIP took effect, the impact on the Evergy Companies' operations and the cost to comply could be material.
Ozone Interstate Transport Federal Implementation Plans
In April 2022, the EPA published in the Federal Register the proposed ITFIP to resolve outstanding "Good Neighbor" obligations with respect to the 2015 Ozone NAAQS for twenty-six states including Missouri and Oklahoma. This ITFIP would establish a revised Cross-State Air Pollution Rule (CSAPR) ozone season nitrogen oxide (NOx) emissions trading program for Electric Generating Units (EGUs) beginning in 2023 and would limit ozone season NOx emissions from certain industrial stationary sources beginning in 2026. The proposed rule would also establish a new daily backstop NOx emissions rate limit for applicable coal-fired units larger than 100 MW, as well as unit-specific NOx emission rate limits for certain industrial emission units and would feature "dynamic" adjustments of emission budgets for EGUs beginning with ozone season 2025. The proposed ITFIP included reductions to the state ozone season NOx budgets for Missouri and Oklahoma beginning in 2023 with additional reductions in future years. The Evergy Companies provided formal comments as part of the rulemaking process. In March 2023, the EPA issued the final ITFIPs for twenty-three states, including Missouri and Oklahoma, which included reduced ozone season NOx budgets for EGUs in Missouri, Oklahoma and other states, and included other features and requirements that were in the proposed version of the rule. Because the EPA's authority to impose an ITFIP for a state is triggered by the state's failure to submit an ITSIP addressing NAAQS by the statutory deadline or disapproval of an ITSIP, the EPA lacks authority under the CAA to impose an ITFIP on a state for which an ITSIP disapproval has been stayed by the courts. Accordingly, the EPA issued interim final rules staying the effectiveness of the ITFIP in both Missouri and Oklahoma while the stays issued by the Eighth and Tenth Circuits in the ITSIP disapproval cases remain in place. During this time, both states will continue to operate under the existing CSAPR program. While Kansas was not originally included in the ITFIP, in January 2024, the EPA issued a proposal to include Kansas in the ITFIP. In June 2024, the U.S. Supreme Court issued an order granting emergency motions for stay filed by state and industry petitioners of the final ITFIP pending further review of the ITFIP by the U.S. Court of Appeals for the D.C. Circuit (D.C. Circuit). In March 2025, the EPA announced plans
to end the Good Neighbor Rule for the 2015 Ozone NAAQS. In April 2025, the D.C. Circuit granted an EPA request to hold all challenges to the ITFIP in indefinite abeyance. In January 2026, the EPA published in the federal register a proposed "Phase 1" reconsideration rule addressing interstate transport requirements for six states, including Kansas. The EPA indicated they intend to address additional states, including Missouri, in a separate action. The Phase 1 proposal would reevaluate and approve previously disapproved ITSIP submissions for five states, including Kansas. As a result, Kansas would no longer be subject to the ITFIP if this rule is finalized. If the ITFIP ultimately takes effect as promulgated for Missouri, Kansas and Oklahoma following the pending litigation or the EPA is unable to end the program as proposed, the impact on the Evergy Companies' operations and the cost to comply could be material.
Particulate Matter National Ambient Air Quality Standards
In March 2024, the EPA published in the Federal Register the final rule which strengthens the primary annual PM2.5 (particulate matter less than 2.5 microns in diameter) NAAQS by lowering the primary annual PM2.5 NAAQS from 12.0 µg/m3 (micrograms per cubic meter) to 9.0 µg/m3. The final rule took effect in May 2024. In August 2024, the EPA released the PM2.5 ambient monitor design values for calendar years 2021 through 2023. These design values are to be used by each state governor for recommending to the EPA attainment designations for their states. In February 2025, the Kansas Governor sent recommendations to the EPA to designate the entire state of Kansas as either attainment or attainment/unclassifiable for the 2024 annual PM2.5 NAAQS. In March 2025, the EPA announced it plans to reconsider the 2024 PM2.5 NAAQS. As a result of the EPA's plans to reconsider this NAAQS, the Missouri Governor delayed submitting area designations to the EPA. While the EPA is required to issue final designations for all states, including Kansas and Missouri, by February 2026, the issuance of final designations is in question based on the EPA's plans to reconsider this NAAQS. In November 2025, the EPA filed a motion requesting that the D.C. Circuit vacate the 2024 PM2.5 NAAQS, asserting that the prior presidential administration's EPA failed to consider costs during its revision process and therefore did not conduct a thorough review, as required. Due to the uncertainty of the attainment status of portions of the service territory and potential reconsideration or court vacatur of the NAAQS, the Evergy Companies are unable to accurately assess the impacts on their operations or consolidated financial results, but the cost to comply with lower PM2.5 NAAQS could be material.
Regional Haze Rule
In 1999, the EPA finalized the Regional Haze Rule which aims to restore national parks and wilderness areas to pristine conditions. The rule requires states in coordination with the EPA, the National Park Service, the U.S. Fish and Wildlife Service, the U.S. Forest Service, and other interested parties to develop and implement air quality protection plans to reduce the pollution that causes visibility impairment. There are 156 "Class I" areas across the U.S. that must be restored to pristine conditions by the year 2064. There are no Class I areas in Kansas, whereas Missouri has two: the Hercules-Glades Wilderness Area and the Mingo Wilderness Area. States must submit revisions to their Regional Haze Rule state implementation plans (SIPs) every ten years and the first round was due in 2007. For the second ten-year implementation period, the EPA issued a final rule revision in 2017 that allowed states to submit their SIP revisions by July 2021.
The Missouri SIP revision does not require any additional reductions from the Evergy Companies' generating units in the state. MDNR submitted the Missouri SIP revision to the EPA in August 2022, however, they failed to do so by the EPA's revised submittal deadline in August 2022. As a result, in August 2022, the EPA published "finding of failure" with respect to Missouri and fourteen other states for failing to submit their Regional Haze SIP revisions by the applicable deadline. This finding of failure established a two-year deadline for the EPA to issue a Regional Haze federal implementation plan (FIP) for each state unless the state submits and the EPA approves a revised SIP that meets all applicable requirements before the EPA issues the FIP. In July 2024, the EPA published in the Federal Register a proposal to partially approve and partially disapprove Missouri's Regional Haze SIP revision.
The Kansas SIP revision did not include any additional emission reductions by electric utilities based on the significant reductions that were achieved during the first implementation period. The Kansas Department of Health and Environment (KDHE) submitted the Kansas SIP revision in July 2021. In August 2024, the EPA issued the final disapproval of the Kansas SIP revision for failing to conduct a four-factor analysis for at least two emission sources in Kansas. In response to the August 2024 final disapproval, in October 2025, KDHE placed a
supplemental Kansas SIP revision on public notice, and no adverse comments were received. In this supplement, the KDHE performed additional analyses for two Kansas emission sources, including Evergy's La Cygne Station, and determined no additional requirements should be necessary for any Kansas emission source. In January 2026, the KDHE submitted the supplement to the EPA for their approval.
In March 2025, the EPA announced plans to restructure the Regional Haze Program and in October 2025, the EPA published a Notice of Proposed Advanced Rulemaking requesting comments to assist in the development of regulatory changes to the current Regional Haze Program. In December 2025, the EPA issued a final rule extending the SIP revision deadline for the third ten-year implementation period from July 2028 to July 2031. Due to uncertainty regarding the status of the Regional Haze Program and when or if a Kansas or Missouri revised SIP or FIP is finalized, the overall costs of implementing the rules could be material to the Evergy Companies.
Greenhouse Gases
Burning coal and other fossil fuels releases carbon dioxide (CO2) and other gases referred to as greenhouse gases (GHG). Various regulations under the CAA limit CO2 and other GHG emissions, and in addition, other measures are being imposed or offered by individual states, municipalities and regional agreements with the goal of reducing GHG emissions. In April 2024, the EPA finalized the GHG regulations and GHG guidelines that apply to new and existing fossil-fuel fired EGUs. The final GHG regulation establishes CO2 limitations on emissions from new and reconstructed stationary combustion turbines. The GHG guidelines set CO2 emission limitations for existing coal, oil and gas-fired steam generating units. For new and reconstructed stationary combustion turbines, the emission limitations were developed by applying the Best System of Emission Reduction (BSER) to three distinct subcategories (low load, intermediate load and base load) taking into consideration the annual capacity factor of the stationary combustion turbine. For intermediate and base load stationary combustion turbines, BSER is assumed to be the utilization of highly efficient combustion turbine technology. Base load stationary combustion turbines are also required to consider the emissions reduction associated with the application of carbon capture and sequestration (CCS) beginning in 2032. For existing coal-fired EGUs, the emission limitations were established by applying the BSER to two subcategories (medium and long-term). For medium-term existing coal-fired units, which are units retiring between 2032 and 2038, the BSER established emission limitation is based on co-firing natural gas beginning in 2030. For units operating in 2039 and after, BSER is the application of CCS starting in 2032. In July 2024, the D.C. Circuit denied motions of stay filed by various states, industry and trade organizations; however, the D.C. Circuit has ordered expedited review of the challenges to the final regulations and guidelines. In December 2024, a three-judge panel of the D.C. Circuit heard oral arguments on challenges to the merits of the rule. In March 2025, the EPA announced it plans to reconsider the GHG regulation and guidelines. While the EPA reconsiders the GHG regulation and guidelines, the D.C. Circuit granted an unopposed motion to hold the case challenging the merits of the rule in abeyance. In June 2025, the EPA published a proposed rule to repeal both the 2015 GHG emission standards for new fossil-fuel fired EGUs and the April 2024 GHG emission standards for new and existing fossil-fuel fired EGUs. In the same June 2025 proposed rule, the EPA included an alternative proposal to repeal the most burdensome requirements of the 2024 rule including the elimination of CCS as BSER. In February 2026, the EPA issued a final rule rescinding the 2009 GHG Endangerment Finding (Endangerment Finding). The Endangerment Finding applies to GHG emissions from new motor vehicles and also provides justification for declaring GHG emissions as a threat to public health and welfare, thereby establishing the basis for regulating GHG emission under the CAA. As a result of the rescission of the Endangerment Finding, there is no justification for continuing to regulate GHG emissions from the power sector.
Due to uncertainty regarding when each of these proposed rules will be finalized, and the ongoing and potential for judicial review, the Evergy Companies are unable to accurately assess the impacts on their operations or consolidated financial results, but the cost to comply could be material.
Regulation of Coal Combustion Residuals
In the course of operating their coal generation plants, the Evergy Companies produce CCRs, including fly ash, gypsum and bottom ash. The EPA published a rule to regulate CCRs in April 2015 that requires additional CCR handling, processing and storage equipment and closure of certain ash disposal units. In January 2022, the EPA published proposed determinations for facilities that filed closure extensions for unlined or clay-lined CCR units. These proposed determinations include various interpretations of the CCR regulations and compliance expectations
that may impact all owners of CCR units. These interpretations could require modified compliance plans such as different methods of CCR unit closure. Additionally, more stringent remediation requirements for units that are in corrective action or forced to go into corrective action are possible. The cost to comply with these proposed determinations by the EPA could be material.
In April 2024, the EPA finalized an expansion to the CCR regulations focused on legacy surface impoundments and historic placements of CCR. This regulation expands applicability of the 2015 CCR regulation to inactive landfills and beneficial use sites not previously regulated. Litigation could impact the timing or cost to comply. In March 2025, the EPA announced its plans to update regulations of CCRs, and in January 2026, finalized a rulemaking extending deadlines for compliance with various aspects of the CCR legacy rule. The EPA has indicated a second rulemaking modifying CCR requirements should be anticipated later in 2026, however specific details of any planned revisions have not been provided.
The Evergy Companies have recorded AROs for their current estimates for the closure of ash disposal ponds, landfills and other historical placements of CCR. The revision of these AROs may be required in the future due to information collected in the April 2024 CCR regulation's Facility Evaluation Reports (FERs), changes in existing CCR regulations, the results of groundwater monitoring of CCR units, changes in interpretation of existing CCR regulations or changes in the timing or cost to close ash disposal ponds and landfills. The revision of AROs for regulated operations has no income statement impact due to the deferral of the adjustments through a regulatory asset. If revisions to these AROs are necessary, the impact on the Evergy Companies' operations or consolidated financial results could be material.
Montrose Station CCRs
In 2025, three lawsuits, including one seeking class certification, were filed in the Circuit Court of Henry County, Missouri against Evergy Metro and two other defendants alleging unspecified damages resulting from the defendants' alleged unlawful and negligent spreading of CCRs associated with the Montrose Station coal ash landfill. Montrose Station was a coal-fired generating facility which was operated by Evergy Metro until its closure in 2018. The cases are at preliminary stages and Evergy and Evergy Metro are unable to assess the outcome or reasonably estimate any possible damages with respect to the claims. However, Evergy and Evergy Metro believe the claims are without merit and intend to vigorously defend themselves.
Nuclear Antitrust Class Action
In July 2025, a class action complaint was filed in the U.S. District Court for the District of Maryland alleging violations of the Sherman Antitrust Act in establishing wages for employees at nuclear facilities since 2003. The complaint names 28 defendants, including all 26 owner operators of nuclear facilities in the United States, or affiliated entities, including Wolf Creek Nuclear Operating Corporation, which operates Wolf Creek, a nuclear facility in Kansas. Evergy indirectly owns 94% of Wolf Creek, with Evergy Kansas Central and Evergy Metro each owning 47% of the nuclear facility. This case is at a preliminary stage and the Evergy Companies are unable to assess the outcome or reasonably estimate any possible damages with respect to the claims.
Nuclear Insurance
Nuclear liability, property and accidental outage insurance is maintained for Wolf Creek. These policies contain certain industry standard terms, conditions and exclusions, including, but not limited to, ordinary wear and tear and war. An industry aggregate limit of approximately $3.2 billion for nuclear events (approximately $1.8 billion of non-nuclear events) plus any reinsurance, indemnity or any other source recoverable by Nuclear Electric Insurance Limited (NEIL), provider of property and accidental outage insurance, exists for acts of terrorism affecting Wolf Creek or any other NEIL insured plant within 12 months from the date of the first act. In addition, participation is required in industry-wide retrospect assessment programs as discussed below.
Nuclear Liability Insurance
Pursuant to the Price-Anderson Act, liability insurance includes coverage against public nuclear liability claims resulting from nuclear incidents to the required limit of public liability, which is approximately $16.3 billion. This limit of liability consists of the maximum available commercial insurance of $0.5 billion and the remaining $15.8 billion is provided through mandatory participation in an industry-wide retrospective assessment program. Under
this retrospective assessment program, the owners of Wolf Creek are jointly and severally subject to an assessment of up to approximately $165.9 million (Evergy's share is $156.0 million and each of Evergy Kansas Central's and Evergy Metro's is $78.0 million), payable at no more than approximately $24.7 million (Evergy's share is $23.2 million and each of Evergy Kansas Central's and Evergy Metro's is $11.6 million) per incident per year per reactor for any commercial U.S. nuclear reactor qualifying incident. Both the total and yearly assessment is subject to an inflationary adjustment based on the Consumer Price Index and applicable premium taxes. In addition, the U.S. Congress could impose additional revenue-raising measures to pay claims.
Nuclear Property and Accidental Outage Insurance
The owners of Wolf Creek carry decontamination liability, nuclear property damage and premature nuclear decommissioning liability insurance for Wolf Creek totaling approximately $2.8 billion. Insurance coverage for non-nuclear property damage accidents total approximately $1.0 billion. In the event of an extraordinary nuclear accident, insurance proceeds must first be used for reactor stabilization and site decontamination in accordance with a plan mandated by the Nuclear Regulatory Commission (NRC). The Evergy Companies' share of any remaining proceeds can be used to pay for property damage or, if certain requirements are met, including decommissioning the plant, toward a shortfall in the nuclear decommissioning trust. The owners also carry additional insurance with NEIL to help cover costs of replacement power and other extra expenses incurred during a prolonged outage resulting from accidental property damage at Wolf Creek. If significant losses were incurred at any of the nuclear plants insured under the current NEIL policies, the owners of Wolf Creek may be subject to retrospective assessments under the current policies of approximately $27.9 million (Evergy's share is $26.2 million and each of Evergy Kansas Central's and Evergy Metro's is $13.1 million).
Nuclear Insurance Considerations
Although the Evergy Companies maintain various insurance policies to provide coverage for potential losses and liabilities resulting from an accident or an extended outage, the insurance coverage may not be adequate to cover the costs that could result from a catastrophic accident or extended outage at Wolf Creek. Any substantial losses not covered by insurance, to the extent not recoverable in prices, would have a material effect on the Evergy Companies' consolidated financial results.
Contractual Commitments
The Evergy Companies' contractual commitments for fuel, power and new generation projects as of December 31, 2025 are detailed in the following tables. See Notes 9, 12 and 21 for information regarding pension, long-term debt and lease commitments, respectively.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Evergy | | | | | | | | | | | | | | | | | | | | |
| | 2026 | | | 2027 | | | 2028 | | | 2029 | | | 2030 | | After 2030 | Total |
| Purchase commitments | | (millions) |
| Fuel | | $ | 313.0 | | | | $ | 202.9 | | | | $ | 194.7 | | | | $ | 181.0 | | | | $ | 93.2 | | | | $ | 384.4 | | | | $ | 1,369.2 | |
| Power | | 73.7 | | | | 83.9 | | | | 104.9 | | | | 123.8 | | | | 105.6 | | | | 176.1 | | | | 668.0 | |
| New generation projects | | 1,023.9 | | | | 1,070.7 | | | | 833.5 | | | | 192.3 | | | | 59.7 | | | | 3.8 | | | | 3,183.9 | |
| | | | | | | | | | | | | | | | | | | | |
| Total contractual commitments | | $ | 1,410.6 | | | | $ | 1,357.5 | | | | $ | 1,133.1 | | | | $ | 497.1 | | | | $ | 258.5 | | | | $ | 564.3 | | | | $ | 5,221.1 | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Evergy Kansas Central | | | | | | | | | | | | | | | | | | | | |
| | 2026 | | | 2027 | | | 2028 | | | 2029 | | | 2030 | | After 2030 | Total |
| Purchase commitments | | (millions) |
| Fuel | | $ | 182.8 | | | | $ | 117.7 | | | | $ | 109.4 | | | | $ | 97.4 | | | | $ | 50.8 | | | | $ | 213.6 | | | | $ | 771.7 | |
| Power | | 1.4 | | | | 1.5 | | | | 12.3 | | | | 20.0 | | | | 19.1 | | | | 44.7 | | | | 99.0 | |
| New generation projects | | 342.3 | | | | 497.7 | | | | 348.2 | | | | 59.1 | | | | 15.9 | | | | 1.0 | | | | 1,264.2 | |
| | | | | | | | | | | | | | | | | | | | |
| Total contractual commitments | | $ | 526.5 | | | | $ | 616.9 | | | | $ | 469.9 | | | | $ | 176.5 | | | | $ | 85.8 | | | | $ | 259.3 | | | | $ | 2,134.9 | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Evergy Metro | | | | | | | | | | | | | | | | | | | | |
| | 2026 | | | 2027 | | | 2028 | | | 2029 | | | 2030 | | After 2030 | Total |
| Purchase commitments | | (millions) |
| Fuel | | $ | 110.8 | | | | $ | 70.7 | | | | $ | 73.8 | | | | $ | 75.2 | | | | $ | 36.7 | | | | $ | 142.2 | | | | $ | 509.4 | |
| Power | | 29.2 | | | | 29.2 | | | | 29.2 | | | | 29.2 | | | | 29.2 | | | | 50.1 | | | | 196.1 | |
| | | | | | | | | | | | | | | | | | | | |
| Total contractual commitments | | $ | 140.0 | | | | $ | 99.9 | | | | $ | 103.0 | | | | $ | 104.4 | | | | $ | 65.9 | | | | $ | 192.3 | | | | $ | 705.5 | |
Fuel commitments consist of commitments for nuclear fuel and coal in addition to coal and natural gas transportation costs. Power commitments consist of certain commitments for renewable energy under power purchase agreements, capacity purchases and firm transmission service. New generation project commitments consist of contractual obligations related to natural gas and renewable plant investments. See "Natural Gas Plant Investments" and "Renewable Plant Investments" in Note 1 for additional information on new generation construction projects.